RK Complex - Sitapaila ,Kathmandu
superhewapc@gmail.com
+977-1-5314512

Super Hewa Khola Hydropower Project - 6 MW


Super Hewa Khola Hydropower Project is a 6 MW Run of River (ROR) type project located at Hewa Khola, between Chainpur and Panchkhapan Municipality of Sankhuwasabha District, Koshi Pradesh, Nepal. The project is situated near Chinpur, the oldest Newari town. The project corresponds to a design discharge of 2.20 m3/s at Q42.5% including Khawa Khola collection on headworks. The intake/decender structure is located at Oringa, while the flushing gate of headrace is located at Oringa Khola, followed by a gravel basin, headrace, and penstock pipeline spanning at least 3 km that passes through Bansghari, Muchhebung, Thebe gaun, and the powerhouse. The switchyard is located at Muchhebung of Chainpur Municipality on the right bank of the Hewa Khola river. The generated electricity is transferred from the switchyard to the Baneshwor sub-station by a 33 KV single-circuit transmission line, which is 13 km long. The project area belongs to the middle mountain region with a rain-fed catchment on the upper Hewa Basin in Sankhuwasabha.

Salient Feature


Project Location
Province Province 01
Zone Koshi
District Sankhuwasabha
Intake Site Bhangtar, just downstream of Hewa-Sewa confluence
Powerhouse Site Agaksu, upstream of Upper Hewa Khola Hydropower Project's headworks
Geographical Co-ordinates Latitude: 27º 20' 55'' N to 27º 22' 15'' N
Longitude: 87º 22' 25'' E to 87º 24' 22'' E
Conservation Area (if applicable) -
General
Name of River Hewa and Khawa Khola
Nearest Settlement Pokhari Bazar/Chainpur
Type of Scheme Run-of-river (RoR)
Gross Head 331.40 m
Net rated Head 320.59 m
Installed Capacity 6000 kW
Peak Hour (if P-RoR) -
Average Annual Energy after Outage 35.72 GWh
Dry Season Energy 11.14 GWh
Wet Season Energy 24.58 GWh
Hydrology
Catchment Area At intake: 39.76 km2 (Hewa 33.52 km2 + Khawa 6.24 km2 + Oringe 2.89 km2)
At powerhouse: 55.8 km2
Average Annual Discharge 2.76 m3/s
Design Discharge (at 42.5% PoE) 2.20 m3/s
Riparian Release 0.055 m3/s
Design Flood Discharge Headworks: 68 m3/s
Powerhouse: 98 m3/s
Average Annual Precipitation 2343 mm
Hewa Collection
Diversion Weir
Type of Weir Diversion weir with side intake
Length of Weir 18.50 m
Crest Elevation 1506.00 masl
Spillway Type Side spillway
Undersluice Opening (W x H) 2.50 m x 2.50 m
Undersluice Invert Level 1502.10 masl
Intake Structure cum Gravel Trap
Type of Intake Side intake with trashrack
Number of Openings 2 nos.
Size of Intake (W x H) 2.0 m x 0.9 m
Intake Sill Level 1505.00 masl
Length of Gravel Trap 15.0 m
Average Width of Gravel Trap 4.0 m
Overall Depth (2.5 - 3.9) m
Particle Size to be Trapped Up to 20 mm
Flushing Channel 1.0 m x 1.0 m
Desanding Basin
Type Dufour double chamber type
Dimension (L x B x H) 50.0 m x 5.0 m x (4.3 - 5.2) m
Inlet Transition Length 10 m
Particle Size to be Settled 0.20 mm
Trapping Efficiency 95%
Khawa Collection
Typology Diversion Weir: Temporary type weir by gabion structure
Intake: Drop intake (0.50 m x 0.50 m)
Gravel Trap: RCC Gravel trap
Collection Pipe: 1490 m long buried 0.50 m dia. HDPE pipe
Oringe Collection
Typology Diversion Weir: Temporary type weir by gabion structure
Intake: Drop intake (0.50 m x 0.50 m)
Gravel Trap: RCC Gravel trap
Collection Pipe: 332 m long buried 0.28 m dia. HDPE pipe
Headrace Pipe
Type Mild steel welded pipe
Internal Diameter 1.35 - 1.15 m
Length 3146.55 m
Steel Thickness / Type of Lining 7 - 20 mm
Number of Anchor Blocks 64 nos.
Surge Tank / Forebay
Type Surge pipe
Connection Pipe Length 78.60 m
Total Length 83.55 m
Up Surge Level 1515.20 masl
Down Surge Level 1494.90 masl
Steel Penstock Pipe
Type Mild steel welded pipe
Internal Diameter 1.05 m and 0.74 m
Length 674.35 m with branch pipe
Steel Thickness 7 - 20 mm
Number of Anchor Blocks 10 nos.
Number of Saddle Supports 46 nos.
Powerhouse
Type Surface with indoor switchyard
Size (L x W) 28.50 m x 17.50 m
Height 18.9 from floor level
Turbine Axis Level 1174.50 masl
Tailrace Type: Rectangular RCC closed
Tailrace Length: 49.0 m
Size (W x D): (1.4 - 2.0) m x 2.0 m
Tailrace Water Level: 1172.20 masl
Turbine Type: Horizontal axis Pelton
Number: 2 nos.
Rated Output per Unit: 3125 kW
Turbine Axis Level: 1174.50 masl
Net Head: 320.59 m
Discharge per Unit: 1.10 m3/s
Efficiency: 90%
Governor Type: Electronic PID Control
Adjustment for Speed Drop: Between 0-5%
Generator Type: 3-phase AC synchronous
Rated Output per Unit: 3530 kVA
Power Factor: 0.85
Generation Voltage: 6.6 kV
Frequency: 50 Hz
Number of Units: 2 nos.
Excitation System: Brushless excitation
Efficiency: 96%
Transformer Type: Outdoor step-up power transformer
Rated Capacity: 7200 kVA
Voltage Levels: 33/6.6 kV (Primary/Secondary)
Number of Units: 1 nos.
Vector Group: YNd11
Frequency: 50 Hz
Efficiency: 99%
Transmission Line
Voltage Level 33 kV
Length 13.50 Km
Conductor Type ACSR DOG, 100 mm2
From Power plant switchyard
To 33/220 kV Baneshwar substation (33 kV busbar)

Project/Developers Key Data


  • Company: Super Hewa Power Company Ltd.
  • Company Registration No: 294426/079/080
  • PAN No: 304560541
  • Project: Super Hewa Khola Hydropower Project, 6MW, Shankhuwa Sabha
  • Issued of Generation License: BS 2075/12/26
  • Grid Connection Agreement: BS 2074/7/15
  • Power Purchase Agreement: BS 2074/12/27
  • Required COD (Proposed): BS 2081/09/29
Super Hewa Khola Hydropower Project

Accessibility


The project site is accessible from Kathmandu via Kathmandu-Bardibas-Itahari-Chainpur road with a total distance of approximately 525 km. The project access road length is about 9 km from Chainpur to the headworks site, which starts from Pokhari Bazar on Chainpur-Nundhaki Highway. Another road also starts from the powerhouse via the lower project headworks.